Amelia Trust Farm: Rooftop Solar PV, Battery Storage and Heating Decarbonisation Works

The contract covers the design, supply, installation and commissioning of rooftop solar photovoltaic systems, battery storage and heating decarbonisation works for Amelia Trust Farm, a Welsh charity operating a working farm and community site. Ynni Teg Cyfyngedig is procuring the works on behalf of Amelia Methodist Trust Company Limited, with delivery at the Sports Hall, Workshop, Llangennith House and Beaver Information Centre at Five Mile Lane, Walterston, Barry, in Cardiff and the Vale of Glamorgan. The scope includes approximately 75 kWp of solar PV, around 161 kWh of co-located battery storage, air-to-air heat pumps with shower hot water provision, a 12 kW electric boiler, removal of redundant oil heating equipment, export limitation, metering, monitoring and grid commissioning documentation. The estimated contract value is £160,000, with practical completion required by 12 March 2027 and grant-funded works completed by 31 March 2027, subject to a two-stage design and installation appointment. MCS certification for each technology, held by the contractor or a named subcontractor, is required.

Buyer: Ynni Teg Cyfyngedig. Source: Sell2Wales. Updated 30 Oct 2026.

Key facts

  • Estimated value: £160k
  • Bids close: 20 Nov 2026
  • Location: Cardiff and Vale of Glamorgan
  • Procedure: Contract notice
  • Category: Batteries (31440000)

From the official notice

Ynni Teg Cyf is running this tender on behalf of Amelia Methodist Trust Company Limited (Amelia Trust Farm), a Welsh charity running a working farm and community site at Five Mile Lane, Walterston, Barry CF62 3AS. The Trust is looking for a single contractor to design, supply, install and commission rooftop solar PV of about 75 kWp across the Sports Hall, Workshop, Llangennith House and Beaver Information Centre; battery storage co-located with each array, about 161 kWh in total; air-to-air heat pumps at the Sports Hall, including hot water for the showers, and at the Beaver Information Centre; and a 12 kW electric boiler at Llangennith House. The works also include removal of the redundant oil boilers and tanks, export limitation, metering and monitoring, DNO commissioning forms and witness testing, and a bilingual funding plaque. The grid connection is 66 kW with G100 export limitation. Ynni Teg makes the G99/G100 application to NGED for the Trust. The works are funded by a Welsh Government capital grant through the Ynni Cymru Capital Grant Programme. Award is conditional on the Grant Award Letter. This is a two-stage appointment: Stage 1 is design, and Stage 2 (supply and installation) goes ahead once the Trust issues a written notice to proceed. The grant deadline of 31 March 2027 is fixed, and practical completion is needed by 12 March 2027. MCS certification is required for each technology, held by the tenderer or by a named subcontractor. Joint bids and specialist subc...

View the official notice

Questions about this tender

When is the deadline?

Bids closed on 20 Nov 2026.

What is it worth?

The estimated value is £160k.

Who can apply?

Any supplier that meets the buyer's requirements can apply. Check the official notice for conditions.

How do I bid?

You can no longer bid on this one. The official notice may show whether the buyer has published a newer competition.

Similar tenders

Contains public sector information licensed under the Open Government Licence v3.0.

See all live tenders