The contract covers a bespoke glazed envelope design-and-build package for the Barbican Arts Centre, a part Grade II listed and heritage-sensitive cultural building owned by the Mayor and Commonalty and Citizens of the City of London. The works follow demolition by others and include new glazing and façade systems for the Conservatory and Stair 8, together with primary steel structures, rooflights, roof lanterns, doors, louvres, gutters, insulation, aluminium panelling and associated enclosure elements. The supplier must also provide Contractor Design Portion design, façade access and maintenance walkways, refurbishment of selected steel framing, automated opening windows, and visual and performance mock-ups, including CWCT Sequence A weather-resistance testing. Delivery is in the UK, with the works centred on the Barbican Arts Centre in London, and the estimated contract value is £10.6 million; the contract duration is not stated. The critical qualification requirement is the capability to design and deliver complex bespoke glazed envelope and structural systems in a listed, heritage-sensitive environment, including the required façade performance testing and mock-ups.

Buyer: The Mayor and Commonalty and Citizens of the City of London. Source: Find a Tender. Updated 2 Oct 2026.

Key facts

  • Estimated value: £10.6m
  • Bids close: Not stated by the buyer
  • Location: London, Haringey and Islington
  • Procedure: Competitive flexible procedure
  • Contract period: 1 Mar 2027 to 27 Mar 2029
  • Category: Building installation work (45300000)

From the official notice

Glass Systems and Envelope — Barbican Renewal Programme. This is a bespoke glazed envelope design-and-build package, not new-build construction, on a part Grade II listed and Heritage sensitive building – The Barbican Arts Centre. The works comprise new glazed envelope and façade systems to the Conservatory and Stair 8, following directly behind the demolition (by others), which removes the existing glazing first. The package includes primary steel structure to the Conservatory and Terrace, and the façade access/maintenance walkway and associated gutters and louvres. The scope of works includes: - Conservatory roof and vertical glazing: louvres, vents, perimeter benches, insulation, aluminum paneling, doors and associated gutters, including the Arid House. - Steel structure relating to Conservatory glazing: primary steel structure supporting the Conservatory roof and vertical glazing systems, carried within this package's own Contractor Design Portion. - Conservatory Lantern: re-glazed roof lantern. - Conservatory Roof lights: Level 02 office roof lights and associated overhead glazing. - Garden Room glazing, doors and associated gutters: refurbished steel framing to Lakeside Terrace with new acoustic double glazing/doorsets, overhead and Conservatory-facing glazing, and plant-room gutter louvre/infill system. - Conservatory Terrace Glazing and Steel: new Level 04 enclosure — bespoke steel T-profile vertical glazing, matching overhead glazing, and the Terrace's primary steel ...

View the official notice

Questions about this tender

When is the deadline?

The buyer has not published a deadline.

What is it worth?

The estimated value is £10.6m.

Who can apply?

The buyer has marked it as suitable for small and medium-sized businesses.

How do I bid?

Open the official notice, register on the buyer's portal and submit your bid before the deadline.

Similar tenders

Contains public sector information licensed under the Open Government Licence v3.0.