Barbican Renewal Programme - MEP Programme

The contract covers the mechanical, electrical and public health (MEP) strip-out and renewal works for the existing Barbican Centre, a major occupied arts venue operated by the City of London Corporation on behalf of The Mayor and Commonalty and Citizens of the City of London. The supplier will remove life-expired MEP infrastructure and install new plant, distribution and containment across basement plant levels and public floors, covering site-wide systems, the Conservatory, Art Gallery Foyer, Curve Gallery, Main Foyers, Stair 8 and Catering Block. Delivery must be phased around continued public operation, including managed access, isolation and shutdown of live services, interfaces with retained systems, and a full 12-month closure from the end of June 2028. The estimated contract value is £50 million, with the overall duration not stated, and works will be delivered at the Barbican Centre in the UK. The Centre is a Higher-Risk Building under the Building Safety Act 2022, so the contractor must provide for all relevant Building Safety Regulator Gateway compliance obligations throughout delivery.

Buyer: The Mayor and Commonalty and Citizens of the City of London. Source: Find a Tender. Updated 14 Sept 2026.

Key facts

  • Estimated value: £50m
  • Bids close: Not stated by the buyer
  • Location: London, Haringey and Islington
  • Procedure: Competitive flexible procedure
  • Contract period: 22 Feb 2027 to 21 Sept 2029
  • Category: Building installation work (45300000)

From the official notice

This trade contract package comprises the Mechanical, Electrical and Public Health (MEP) strip-out and renewal works forming part of the Barbican Renewal Programme (BRP), a major infrastructure renewal of the existing, occupied Barbican Centre on behalf of the City of London Corporation (Contracting Authority, operating the Barbican Arts Centre as Employer). The works are to be let under a JCT CM/TC 2024 Trade Contract, delivered under a Construction Management approach, with Blue Sky Building appointed as Construction Manager and Gardiner & Theobald LLP as Lead Consultant. This is a strip-out and renewal package, not new-build construction. The works comprise the removal of existing, life-expired MEP infrastructure and the installation of new plant, distribution and containment across multiple basement plant levels and public floors of a large, live, publicly operated arts venue comprising a concert hall, cinemas, art galleries, conservatory, library, function rooms and car parks. The Trade Contractor will be required to work around continued public operation of the Centre, including phased access, a full 12-month closure period from end June 2028, isolation and shutdown of live building services, and interfacing with retained plant and systems, across every work area described below The MEP package is a single trade contract comprising the following designated work area sections: • MEP Infrastructure and Site-Wide Systems • Conservatory • Art Gallery Foyer • Curve Gallery •...

View the official notice

Questions about this tender

When is the deadline?

The buyer set no deadline and the notice was published more than 60 days ago.

What is it worth?

The estimated value is £50m.

Who can apply?

Any supplier that meets the buyer's requirements can apply. Check the official notice for conditions.

How do I bid?

You can no longer bid on this one. The official notice may show whether the buyer has published a newer competition.

Similar tenders

Contains public sector information licensed under the Open Government Licence v3.0.

See all live tenders