Boiler Room Upgrade at Kensington Palace
The contract covers the upgrade of the boiler room serving offices in the apartments at Kensington Palace, procured by the Royal Household, the organisation responsible for supporting the official residences and functions of the Sovereign. The works require removal and disposal of the existing end-of-life atmospheric gas boilers and installation, testing and commissioning of high-efficiency condensing boilers, new hot water cylinders, plate heat exchangers, pipework, valves and associated electrical equipment. The supplier must survey and replace or reline boiler flues, upgrade the gas supply and safety valves where required, clean and dose the heating system, replace thermostatic radiator and lockshield valves, complete builders’ work and redecoration, and provide testing records, certification, operation and maintenance manuals and handover documentation. The completed system must improve energy efficiency, maintain reliable heating and hot water, and allow future connection to a district heat network. The estimated contract value is £325,000, with delivery at Kensington Palace; no contract duration or wider delivery region is specified. The critical qualification requirement is not stated in the available tender information.
Buyer: The Royal Household. Source: Find a Tender. Updated 13 Nov 2026.
Key facts
- Estimated value: £325k
- Bids close: 11 Dec 2026
- Location: Westminster
- Procedure: Below threshold - open competition
- Contract period: 31 Mar 2027 to 30 Jun 2027
- Category: Boiler installations (42160000)
From the official notice
The works are located within the Boiler Room serving the offices in apartments at Kensington Palace. The project comprises the replacement of the existing end-of-life atmospheric gas boilers with new high-efficiency condensing boilers, together with the installation of new hot water cylinders, associated pipework, valves and plate heat exchangers. The new heating system shall be designed to facilitate future connection to a heat network, which is currently being investigated through a joint RHPS/HRP feasibility study. The existing boiler flues, originally designed for atmospheric boilers, shall be surveyed and either replaced or relined as required to suit the new plant. The Contractor shall also assess the adequacy of the existing gas supply and undertake any necessary upgrades, including the replacement of obsolete mechanical gas drop safety valves with modern electrically operated solenoid valves. The works shall include, but not be limited to: •Removal and disposal of existing boilers, associated plant and redundant equipment. •Installation, testing and commissioning of new condensing boilers. •Installation of new hot water cylinders, plate heat exchangers, pipework, valves and associated ancillaries. •Survey, replacement and/or relining of existing flues as required. •Upgrades to the gas supply infrastructure where necessary. •Removal and replacement of all electrical installations and equipment required to serve the new plant. •Cleaning, flushing and dosing of the exist...
Questions about this tender
When is the deadline?
Bids close on 11 Dec 2026.
What is it worth?
The estimated value is £325k.
Who can apply?
The buyer has marked it as suitable for small and medium-sized businesses.
How do I bid?
Open the official notice, register on the buyer's portal and submit your bid before the deadline.
Similar tenders
- BA Compressor Maintenance 2026-2030
- The Supply & Installation of Replacement Communal Laundry Equipment
- Pre-Market Engagement: CCTV, Access Control, Fire Alarms and Intruder Alarms
Contains public sector information licensed under the Open Government Licence v3.0.