Estates SW: Replacement of Air Cooled Chillers in CRC Cork University Hospital

The contract covers the full turnkey replacement of two existing Dunham Bush air-cooled chillers on the Clinical Research Centre (CRC) roof at Cork University Hospital (CUH). The buyer is the Health Service Executive (HSE), Ireland’s public healthcare organisation, and the works must provide a fully operational chiller installation serving the CRC building. The supplier will be responsible for supplying, delivering, lifting, installing, testing, commissioning and handing over two new chillers, as well as safely removing and disposing of the existing units, completing all associated mechanical, electrical, controls and civil works, and integrating the replacement equipment with existing services and controls. The units must be an approved equivalent to the existing Climaveneta (Mitsubishi Electric) equipment and match the required cooling duty and operating conditions; no contract value or duration is specified. Delivery is at Cork University Hospital in County Cork, Ireland (IE053). The critical technical requirement is compatibility with the existing CRC control system and compliance with the detailed scope covering cranage, testing and commissioning.

Buyer: Health Service Executive (HSE). Source: eTenders Ireland.

Key facts

  • Estimated value: Not stated by the buyer
  • Bids close: Not stated by the buyer
  • Location: South-West
  • Procedure: Open

From the official notice

This project comprises the replacement of the existing 2 No. Dunham Bush air-cooled chillers located on the Clinical Research Centre (CRC) roof at Cork University Hospital (CUH). The works shall be undertaken on a full turnkey basis and shall include the supply, delivery, installation, testing, commissioning and handover of two new air-cooled chillers, together with all associated mechanical, electrical, controls, civil works and lifting operations necessary to provide a fully operational chiller installation. The replacement chillers shall be, an approved equivalent to that currently installed which are Climaveneta (Mitsubishi Electric) units, to ensure compatibility with the existing control system serving the CRC building. The proposed units shall be selected to match the required cooling duty and existing system operating conditions. The Contractor shall be responsible for the safe removal and environmentally compliant disposal of the existing chillers, installation of the replacement equipment, integration with the existing services and controls, and commissioning of the complete installation. This section provides a high-level overview of the project. Tenderers shall refer to Section 3 – Detailed Scope of Works for the full extent of the Contractor's responsibilities, including all mechanical, electrical, controls, civil, cranage, testing and commissioning requirements.

View the official notice

Questions about this tender

When is the deadline?

The buyer has not published a deadline.

What is it worth?

The buyer has not published a value.

Who can apply?

Any supplier that meets the buyer's requirements can apply. Check the official notice for conditions.

How do I bid?

Open the official notice, register on the buyer's portal and submit your bid before the deadline.