FCDO Accra British High Commission Offices Redevelopment, Ghana

The contract covers the phased redevelopment of the Foreign, Commonwealth and Development Office’s British High Commission estate in Accra, Ghana, a government and diplomatic facility operated by the UK foreign affairs department. Works include minor alterations to the Afadja site to provide temporary decant accommodation, refurbishment of the Volta building into a fit-for-purpose open-plan office, replacement of mechanical and electrical installations, seismic strengthening, structural works, demolition of existing plant structures, and external landscaping, cloisters, walkways and shared spaces. Construction is expected to begin at the vacant Volta site before staff relocate there to allow phase-two works at Afadja, with delivery under an anticipated NEC4 ECC Option A contract and potentially an Early Contractor Involvement stage. The estimated contract value is £10.6 million; the construction timeframe is not stated, although phased delivery is anticipated. The works will be delivered across the adjoining Volta and Afadja sites on Julius Nyerere Link Road in central Accra. The critical requirement is the ability to provide personnel holding UK Security Check (SC) clearance to manage interfaces with higher-security areas.

Buyer: Foreign, Commonwealth and Development Office. Source: Find a Tender. Updated 20 Nov 2026.

Key facts

  • Estimated value: £10.8m
  • Bids close: Not open for bids yet
  • Location: Westminster
  • Procedure: Competitive flexible procedure
  • Contract period: 3 Jun 2027 to 1 Nov 2030
  • Category: Construction work (45000000)

From the official notice

Project Overview 1.1 The route to market is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage. 1.2 The scope of the project is to redevelop two existing sites (Afadja and Volta) to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two sites that sit side by side. It is located on Julius Nyerere Link Road in a reasonably affluent and central part of Accra, close to Parliament, the Presidency and some Ministries. The office estate in Accra is tired and in poor condition (in places), having suffered from a lack of strategic investment and maintenance. 1.3 It is anticipated that the consturction will take place in phases. Work will start at the Volta site which will be vacant throughout construction (staff normally based at this site will be temporarily moved to the Afadja Site). Once construction works at the Volta site are complete, all of the staff at the Afadja site will be transferred to the Volta site to enable the phase 2 works to be undertaken in the unoccupied Afadja building. 1.4 In line with the overall estate strategy, the intention is to have the Volta HC Office staff move to the Afadja High Commission for the duration of the Volta construction period. 1.5 The existing sites comprises of: • An existing split-site office building. It is proposed that the Volta building be retained and refurbished. • Existin...

Questions about this tender

When is the deadline?

Bidding has not opened yet. The buyer has published it as a planned tender.

What is it worth?

The estimated value is £10.8m.

Who can apply?

Any supplier that meets the buyer's requirements can apply. Check the official notice for conditions.

How do I bid?

You cannot bid yet. Follow the official notice for the competition that comes next, and check how the buyer's portal lets suppliers register.

Similar tenders

Contains public sector information licensed under the Open Government Licence v3.0.

See all live tenders