HWTWRP Continued ME4
The contract covers the Hampshire Water Transfer and Water Recycling Project, a strategic water infrastructure scheme commissioned by Southern Water Services Limited, a UK water and wastewater utility. The appointed Competitively Appointed Provider will design, build, finance, maintain and operate a Water Recycling Plant, tunnel and pipeline connections, a High Lift Pumping Station, intermediate pumping stations, break pressure tanks and an approximately 42 km transfer system to Otterbourne Water Supply Works. The project will treat wastewater to produce purified recycled water, combine it with water from Portsmouth Water’s Bedhampton Springs, store the resources in the new Havant Thicket Reservoir and transfer them for treatment to drinking-water standards before supply. The delivery region is the United Kingdom, including the UKJ region, with works centred in Hampshire and extending to Otterbourne. The estimated contract value and duration are not specified; the critical qualification is the ability to deliver the full DBFOM infrastructure project under Ofwat’s Direct Procurement for Customers model.
Buyer: Southern Water Services Limited. Source: Find a Tender. Updated 6 Oct 2026.
Key facts
- Estimated value: Not stated by the buyer
- Bids close: Not open for bids yet
- Location: South East (England), West Sussex (South West)
- Contract period: 12 Sept 2029 to 31 Mar 2059
- Category: Parts of tunnelling machinery (43614000)
From the official notice
The Hampshire Water Transfer and Water Recycling Project (The Project) is a Strategic Resource Option (SRO) and a major part of Southern Water’s long-term strategy to address the significant water supply shortfall in Hampshire. By using advanced water treatment technologies, the Project will transform treated wastewater, normally pumped far out to sea, into purified recycled water. This new resource will supplement natural spring water from Portsmouth Water’s Bedhampton Springs, with both sources being stored in the new Havant Thicket Reservoir. This integrated approach will maximise the reservoir’s capacity, ensuring greater water availability, especially during periods of drought. Water from the reservoir will be transferred to our existing Otterbourne Water Supply Works, where it will undergo further treatment to strict drinking water standards prior to going into supply. By establishing a sustainable and resilient water source, the Project will help safeguard essential water supplies for our customers while reducing reliance on environmentally sensitive water sources. The Project consists of a Water Recycling Plant, tunnel and pipeline connections, a High Lift Pumping Station, and a circa 42 km transfer to Otterbourne Water Supply Works inclusive of intermediate pumping stations and break pressure tanks. The Project scope includes Design, Build, Finance, Maintain and Operate (DBFOM) of new water infrastructure, including water recycling, water transfer, and substantial tu...
Questions about this tender
When is the deadline?
Bidding has not opened yet. The buyer has published it as a planned tender.
What is it worth?
The buyer has not published a value.
Who can apply?
Any supplier that meets the buyer's requirements can apply. Check the official notice for conditions.
How do I bid?
You cannot bid yet. Follow the official notice for the competition that comes next, and check how the buyer's portal lets suppliers register.
- More Machinery for mining, quarrying, construction equipment tenders
- More tenders in South East
- More tenders from Southern Water Services Limited
Similar tenders
- Groundworks, Trenchless Installation and Ancillary Civil Engineering Services Closed Framework
- Hopwas playground & playing field refurbishment
- DfI TRAM - Supply of Various Mobile Plant and Machinery
Contains public sector information licensed under the Open Government Licence v3.0.