ITT - Swindon Archive Decarbonisation Design Team (UID 320)
Historic England, the public body responsible for protecting England’s historic environment, is seeking a multidisciplinary design team for the Archive Decarbonisation Project at its national archive facility in Swindon. The contract covers development of the preferred decarbonisation and resilience方案 through RIBA Stage 3, including replacement of end-of-life environmental control systems, archive-zone rationalisation, fabric and airtightness improvements, fire-safety works, and creation of additional storage by repurposing plant-room space. The team must coordinate architectural, structural and building-services designs, validate surveys and building-physics modelling, prepare a planning application, undertake cost, whole-life carbon and value assessments, engage stakeholders, and support fundraising; RIBA Stage 4 may be awarded subsequently subject to satisfactory Stage 3 completion and acceptable methodology and pricing. The contract value and delivery timeframe are not specified, and delivery is at Historic England’s archive facility in Swindon. A critical requirement is demonstrated compliance with relevant archive and conservation standards, including BS EN 16893:2018, while maintaining stringent environmental conditions for nationally important collections.
Buyer: Historic England. Source: Find a Tender. Updated 9 Oct 2026.
Key facts
- Estimated value: £149k
- Bids close: Not stated by the buyer
- Location: Swindon
- Procedure: Competitive flexible procedure
- Contract period: 28 Jan 2027 to 30 Sept 2027
- Category: Environmental improvement works (45262640)
From the official notice
Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3). The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind. The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity. A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance...
Questions about this tender
When is the deadline?
The buyer has not published a deadline.
What is it worth?
The estimated value is £149k.
Who can apply?
Any supplier that meets the buyer's requirements can apply. Check the official notice for conditions.
How do I bid?
Open the official notice, register on the buyer's portal and submit your bid before the deadline.
Similar tenders
- Education Authority - Dynamic Shortlisting System - Mechanical Works Contractors (DSS4-MECH)
- EDUCATION AUTHORITY - DYNAMIC SHORTLISTING SYSTEM - PREFABRICATED ACCOMMODATION (DSS3-PA) - New Applicants
- Education Authority - Dynamic Shortlisting System - Building Works (DSS1-BW) - New Applicants
Contains public sector information licensed under the Open Government Licence v3.0.