PRO005185-Works-Framework-Rainwater Solutions
The contract covers the delivery of rainwater management solutions for United Utilities Water Limited, a UK water and wastewater utility. The framework will appoint five partners to provide both Design & Build and Build Only works, with the delivery route selected for each scheme according to programme needs, complexity and design maturity. Expected solutions will apply Sustainable Drainage principles, including surface conveyance, infiltration, disconnection, attenuation, rainwater capture and reuse, to slow water movement through catchments and reduce pressure on the wastewater network. The interim framework is intended to support immediate AMP8 requirements over a 12- to 18-month period and has an estimated total value of £40 million, while also informing future AMP8 and AMP9 procurement arrangements. Work will be delivered across the United Utilities region in the UK, identified as UKD. The critical qualification requirement is the demonstrated capability and capacity to undertake the required Design & Build and/or Build Only rainwater management works.
Buyer: United Utilities Water Limited. Source: Find a Tender. Updated 2 Nov 2026.
Key facts
- Estimated value: £40m
- Bids close: 16 Nov 2026
- Location: North West (England), Warrington
- Procedure: Competitive flexible procedure
- Contract period: 4 Dec 2026 to 3 Dec 2027
- Category: Drainage and surface works (45232451)
From the official notice
United Utilities' (UU) Rainwater Management Strategy is founded on Sustainable Drainage principles, which prioritise the capture, reuse and management of rainwater as close as possible to where it falls. The strategy promotes the use of surface conveyance, infiltration, disconnection and attenuation to slow the movement of water through the catchment and reduce pressure on the wastewater network. We are looking to appoint 5 partners to support the delivery of Rainwater Solutions over the next 12 to 18 months. This framework forms an interim procurement solution to support with immediate AMP8 delivery requirements whilst United Utilities develops its longer-term Rainwater Management delivery model. The framework will provide access to suppliers capable of undertaking both Design & Build and Build Only delivery of Rainwater Management solutions and will generate valuable insight into supplier capability, capacity, performance and delivery approaches to inform future procurement arrangements supporting the wider AMP8 and AMP9 programme. The Rainwater Solutions Framework will support a combination of Design & Build and Build Only commissions, with the procurement delivery route determined on a scheme-by-scheme basis depending on programme requirements, complexity and design maturity
Questions about this tender
When is the deadline?
Bids closed on 16 Nov 2026.
What is it worth?
The estimated value is £40m.
Who can apply?
The buyer has marked it as suitable for small and medium-sized businesses.
How do I bid?
You can no longer bid on this one. The official notice may show whether the buyer has published a newer competition.
- More Construction work tenders
- More tenders in North West
- More tenders from United Utilities Water Limited
Similar tenders
- Education Authority - Dynamic Shortlisting System - Mechanical Works Contractors (DSS4-MECH)
- EDUCATION AUTHORITY - DYNAMIC SHORTLISTING SYSTEM - PREFABRICATED ACCOMMODATION (DSS3-PA) - New Applicants
- Education Authority - Dynamic Shortlisting System - Building Works (DSS1-BW) - New Applicants
Contains public sector information licensed under the Open Government Licence v3.0.